The "Ready Mix Concrete Blackfriars" concrete plant offers concrete pumping. Additional information for customers ordering concrete pumping service. The place for setting the pump, hydraulic pump supports and pear assembly should be hardened. The level of the pump stand must not be higher than the access road for the truck concrete mixer, as this could prevent unloading of the concrete mixer. The access of concrete mixers should be located in such a way that the concrete mixer has to drive the shortest distance backwards. There should be no trees or any electric traction lines at the place of extension of the jib and pump mast operation. Order Concrete Pump Blackfriars